COB Multi-mode Automatic Alignment Station

Active solution > COB Multi-mode Automatic Alignment Station > COB Multi-mode Automatic Alignment Station

COB Multi-mode Automatic Alignment Station

Product Function Introduction

The alignment station is composed of automatic stepped module, visual orientation,automatic gluing and Marble vibration isolation system

4 axis high-precision stepper motor is used to adjust the parallelism between PCB and AWG with advanced structure design and fixture.

Visual orientation system improves the accuracy of lens alignment position, reduces the alignment time and reduces the position error caused by material difference.

Process operation, compatible with TOSA Lens, ROSA Lens, BOSA Lens and other materials.

Quick fixture switch to reduce the feeding time, and the feeding operation is simple and convenient.

The fixture automatic clamps materials from tray.

Advanced algorithm to realize the head and tail scanning, accurately calculate the coupling angle to realize multi-channel balance, calculate the flat area and common flat area of each channel. Scan the original data and save the test results to the database.

A pressure sensor is designed perpendicular to the PCB direction to accurately locate the vertical alignment distance and prevent collision during the alignment process

Advanced structure and marble vibration isolation design to ensure the responsivity change is less than 5% between before UV and after UV.

One-key operation after manual feeding, No man on duty in the all whole process.

 

System Performance Index 

Specification

Requirements

unit

Description

Products

10G/40G/100G

400G/800G

-

TX / RX,  SR1/SR4/SR8等

Alignment Materials

Lens

-


Axis accuracy

±0.1

±0.01

um

°


Repeatability

2%

-

Responsivity value repeatability during repeated alignment for the same material

Stability

5%

-

Maximum responsivity value fluctuation  between before UV and after UV

Angle Accuracy

0.1

°

Maximum fluctuation of Coincidence degree in all channels trace.

Alignment Time

15

S

Time from no signal to capturing optical signal of one channel.

Cycle Time

2~3.5

Min

Time from load material to complete alignment (include 60S UV time).